Eastleigh Works, Southern Railway. Interior of carriage building workshop, 1946/47
All-steel carriages for 4-SUB (or later 4-EPB) units under construction. The bodies of all these were built at Eastleigh Works, as special jigs were used for assembly. Probably, the first carriage on the left and the second on the right both have 9 compartments (they were intended for use as 1st/3rd composites, which never happened). All the carriages of this type were built in 1946 and 1947