The Penydarren Tramroad also known, with greater accuracy, as The Merthyr Tramroad, was formed in 1799 by agreement of the three Merthyr ironworks (Dowlais, Penydarren and Plymouth) to build a tramroad from “the Lime Stone Rocks at Castle Morlais to Craig Evan Leyson”, and by-pass the upper section of the Glamorganshire Canal, which ran from the yard of the fourth Merthyr ironworks, Cyfarthfa to Navigation (Abercynon). It opened in 1802.
The Castle Morlais Quarries plateway was owned by the Dowlais Ironworks and was constructed as part of the Penydarren Tramroad. It ran from the Dowlais line at Penydarren, North to Castle Morlais (2m). It opened in 1803, with mixed gauges of 4' 2" and 2' 9½".
Dowlais. From near the termination of the canal in Merthyr at Jackson’s Bridge, Bethesda Street, east to Dowlais Ironworks (1½m). Opened 1793. Track: plateway, 4’ 2½” gauge. Tram engine: after 1834 (rack rail). Closed c1853.
The Castle Morlais Quarries plateway was owned by the Dowlais Ironworks and was constructed as part of the Penydarren Tramroad. It ran from the Dowlais line at Penydarren, North to Castle Morlais (2m). It opened in 1803, with mixed gauges of 4' 2" and 2' 9½".
Dowlais. From near the termination of the canal in Merthyr at Jackson’s Bridge, Bethesda Street, east to Dowlais Ironworks (1½m). Opened 1793. Track: plateway, 4’ 2½” gauge. Tram engine: after 1834 (rack rail). Closed c1853.